Hill

Project Description

Location: Ogden, Utah

Owner: Hill Air Force Base

Installed Controls System Value: $104,000.00

Project Duration: 2013-2014

Delivery Mode: Plan/Spec

 

Controls System Scope of Work:

  • Reheat VAV terminal boxes
  • Hydronic heating water generation and distribution control
  • Hydronic chilled water generation and distribution
  • Gas, water, and electrical metering
  • Extensive Alerton based DDC building automation incorporating multiple tenant function, high performance energy conservation algorithms.
  • Design, programming and installation all by ACES.