HAFB F-22 Support Facility

Hill

Project Description

Location: Ogden, Utah

Owner: Hill Air Force Base

Installed Controls System Value: $104,000.00

Project Duration: 2013-2014

Delivery Mode: Plan/Spec

 

Controls System Scope of Work:

  • Reheat VAV terminal boxes
  • Hydronic heating water generation and distribution control
  • Hydronic chilled water generation and distribution
  • Gas, water, and electrical metering
  • Extensive Alerton based DDC building automation incorporating multiple tenant function, high performance energy conservation algorithms.
  • Design, programming and installation all by ACES.

Hexcel Resin Building

Hexel

Project Description

Location:                                                                     West Valley City, Utah

Owner: Hexcel Corporation

Installed Controls System Value: $46,700.00

Project Duration: 2012-2014

Delivery Mode: Design / Build

 

Controls System Scope of Work:

  • IBEX/BACtalk system conversion
  • High temperature oven control and monitoring
  • Freezer temperature control and monitoring
  • Cooper alarm annunciation integration to the Alerton DDC control system
  • Extensive Alerton based DDC building automation, and high performance energy conservation algorithms.
  • Design, programming and installation all by ACES.

Intermountain Power Service Corporation

Intermountain

Project Description

Location: Draper, Utah

Owner: Intermountain Power Service Corp.

Project Duration: 2012-Present

Delivery Mode: Design / Build

 

Controls System Scope of Work:

  • Electric heat multi-stage VAV terminal boxes
  • Hydronic heating water generation and distribution
  • Hydronic chilled water generation and distribution
  • Electrical install for new chiller units
  • HVAC on the following facilities: AQCS Controls Buildings 1 & 2, Water Treatment Building, Coal Car Unloading Building, Utility Service Building, Limestone Preparation Building, Bag House 1 & 2, Control and Service Building, Control and Service Cooling Tower Building, Site Services Building, Sludge Building, Coal Transfer Building #2 and Administration Building.
  • Extensive Alerton based DDC building automation, high performance energy conservation algorithms.
  • Design, programming and installation all by ACES.
  • Worked with Wilson Mohr on the design, engineering, and commissioning.

Edwards Lifesciences

Edwards

Project Description

Location: Draper, Utah

Owner: Edwards

Project Duration: 2012-2014

Delivery Mode: Plan/Spec

 

Controls System Scope of Work:

  • Installed Alerton controls to integrate with the packaged Aaon rooftop unit controls for the clean rooms
  • IBEX/BACtalk system installation and integration
  • Alerton/ Automated Logic system integration
  • Extensive Alerton based DDC building automation, high performance energy conservation algorithms.
  • Design, programming and installation all by ACES.